First, the content of the procurement project:
The first package: LED display system; the second package: network management software, etc. Second, supplier qualification:
1. Comply with the provisions of Article 22 of the Government Procurement Law;
2. The registered capital is not less than 1 million yuan;
3. The first package requires: in the past two years, there is an indoor full-color LED display (single screen area of ​​10 ┫ or more), the project performance is not less than 3;
Third, the content of the negotiation materials that the supplier must submit:
1. A photocopy or photocopy of the business license and tax registration certificate that passed the valid annual inspection
2. Legal representative's power of attorney (original, if the legal person represents himself to participate in the bidding, this is not required)
3. Bidding Price List
4. Authorization of the manufacturer of the product to be invested (see requirements in the requirements)
5. At least one P6 or P7.62 sample display screen shall be provided at the time of bidding, and the full screen pure red, pure green, pure blue, pure white and text patterns shall be displayed independently when power is on. The sample screen of the winning unit will be displayed. As the basis for final acceptance.
6. Localization Service Certification (or Commitment)
7. Basic information of bidders
8. Relevant certification obtained by the technical engineer of the bidder
9. Successful cases or experience proofs similar to this project, and provide proof of contract and other supporting materials (first package must be provided, second package available)
10. Proof of information required by other negotiating documents.
Note: The bidder shall ensure the authenticity, validity and legality of the above-mentioned certification documents. Otherwise, any responsibility arising therefrom shall be borne by the bidder.
Fourth, the construction period requirements: 5 calendar days 5, negotiation time and place:
1. Negotiation date: 9:00 am on March 13
2. Venue: Hefei Municipal Government Procurement Center (Room 3012, 3rd Floor, Xingtai Building, 45 Jiu Shiqiao Street, Hefei)
6. Date and place of receipt of the quotation:
Date of receipt of the quotation: From 8:30 on March 13, 2009 to 9:00 on March 13, 2009, the quotation submitted in advance or overdue or the quotation that does not meet the requirements will not be accepted. (The quotation requires 1 original, 2 copies, must be sealed and the outer envelope is covered with a seal)
Receive Quotations Location: Hefei City Government Procurement Center Purchase Group (Room 3007, 3rd Floor, Xingtai Building, 45 Jiu Shiqiao Street, Hefei)
VII. Negotiation documents for sale:
1. Release time: March 6, 2009 - March 12, 2009, 8:30-12:00; 14:30-17:00 (excluding weekends and holidays)
2. Selling method: Fax or email to confirm the purchase of the supplier. Please send the voucher for the purchase of the tender to our center by fax or email (the company name, project name, project number and purchased subcontract should be indicated on the voucher). No. and other information, accompanied by the company's relevant qualification certificate), and fax or email to indicate the name of the purchase unit, contact person and contact information (mobile phone, email, etc.). Suppliers can also register on-site.
Receive email address:
3. Negotiation document price: 200 yuan / package (not refundable after sale)
Eight, negotiation deposit handling methods:
The bidder shall pay a negotiation deposit of 3,000 yuan/bag to the procurement center.
IX. Judging methods and criteria for negotiation:
The negotiation will be conducted by a ranking method.
During the negotiation, each supplier participating in the negotiation gave the last written explanation and the final offer. The negotiating team will sort the suppliers according to the negotiation situation and determine the selected suppliers according to the ranking results. The first place will be counted as 3 points, the second place will be counted as 2 points, and the third place will be counted as 1 point. The purchasing center staff summarizes the results of the sorting of the negotiating team to obtain the supplier's score. When the score is summarized, the purchasing center determines the order of the supplier's final score from high to low. If the scores are the same, in the order of preference of the lower bid; the scores and quotes are the same, in the order of preference of the technical indicators of the products being cast.
X. Supplier Information:
1. The supplier shall ensure the authenticity, validity and legality of the negotiation materials provided by it, otherwise any liability arising therefrom shall be borne by itself.
2. In order to ensure the smooth progress of the negotiation activities, the supplier shall send relevant technical personnel to answer questions on the spot. Suppliers should be prepared as required.
3. The negotiating team will first conduct a conformity review of the basic qualifications of each supplier, and at the same time conduct a preliminary review of the responsiveness of the negotiation materials. Suppliers that have not passed the preliminary review will not participate in the negotiation.
4. The negotiation team will negotiate with the supplier on a quotation, equipment configuration and after-sales service. The supplier's last written quotation is the final basis for signing the contract.
5. The transaction supplier shall submit a performance bond of 5% of the total contract price (one year) to Party A before signing the contract, and submit a 1.5% service fee to the procurement center.
6. If the supplier has any questions about this letter, please contact our center in time, and our center will reply as soon as possible.
XI. Payment method: The equipment arrives and all the installation and commissioning is completed. After passing the acceptance of Party A, all the contract payments are paid.
Twelve, contact method:
Bank: Huishang Bank, Hefei City, Gulou Branch Account No. 0078 082
Pre-note:
1) The technical parameters proposed in the requirements are for reference only, and the bidder may select related products whose performance is not lower than the requirements;
2) In order to encourage full competition of different brands, if a major technical parameter is exclusive to an individual brand, the main technical parameters are not restrictive, and the bidder may make appropriate adjustments to the parameter and explain the reasons for the adjustment.
3) The reference (or recommended) brand in the demand is for reference only. There is no restriction. The bidder can choose other products that are comparable or better than the reference (or recommended) brand, and should provide relevant technical information.
The first package: technical requirements Full-color LED display system technical requirements First, the technical requirements of the tender documents:
This system is the LED large-screen display system of the Hefei Municipal People's Procuratorate Inspection Technology Comprehensive Building, which requires high quality picture of the electronic screen, good effect and ensure the construction quality.
1. Satisfy the viewing quality;
2, to meet the requirements of the camera to shoot large screen picture quality;
3, the large screen is 2, P7.62 screen area is 8.33 square meters (width 3.416 meters * height 2.44 meters), P6 screen area is 4.86 square meters (width 4.608 meters * height 1.056 meters);
4, the use of box structure, wall-mounted installation;
5, the large screen looks beautiful and in line with the public's aesthetic standards;
Second, the main technical specifications
P7.62 specification display:
1, pixel indicators:
Pixel pitch: 7.62mm
Pixel composition: 1PR+1PG+1PB
Pixel point density: 17222 points / square meter
2, LED die: imported dilute, pure red, pure green, pure blue three primary color LED, the center point spacing is 7.62mm; display lighting tube brightness parameters:
The average brightness of the luminous tube is the best viewing angle. The central wavelength test condition is pure red? 250mcd 140/90o 620-625nm 25°C, 20mA
Pure green?? 460mcd 140/90o 520-525nm 25°C, 20mA
Pure blue?? 95mcd 140/90o 465-470nm 25°C, 20mA
3, the main technical indicators of the display body The entire display consists of the unit box, control circuit, switching power supply, steel frame structure, interior and exterior decoration.
Classification specifications and parameter requirements
1. Unit box physical point spacing: 7.62 mm
Lattice density: 17222 points / m2
Pixel composition: 1R1G1B
Drive mode: constant current drive single module resolution: 32 * 16 = 512 points box thickness: 100mm
Cabinet color: black or computer gray (optional)
2, the screen display screen full screen display area: 8.33 square meters best line of sight: 5M-50M
Best viewing angle: 120 degree working environment temperature: -25 °C - +55 °C
Working environment humidity: 25% - 95%
More than 5 frames around the entire screen
3, power supply working voltage: AC220V/220V or 380V ± 10%, 50Hz (three-phase five-wire system)
Maximum power consumption: about 900W/m2
Average power consumption: about 450W/m2
Cabinet input voltage: 220±10%
4, control system operating system: WINDOWS98, WINDOWSNT WINDOWS2k WINDOWSXP
Control method: VGA synchronous graphics: DVI graphics
5, the main technical parameters brightness: 1400cd / m2 per square brightness
Gray level: 256 levels of gray per point base color.
Display color: 256*256*256, a total of 167,772 colors, mean time between failures: 10,000 hours of screen life: >100,000 hours (when the brightness is reduced by half)
Factory out of control rate: Zero image transmission speed: ≥160 frames/second Screen refresh rate: 300HZ (can be set according to computer refresh rate)
Brightness adjustment mode: software adjustment according to ambient brightness (0%-100% continuously adjustable)
Video input mode: configure multimedia video card, support various video, RF signal input control system: DVI graphics card + data acquisition card + data acceptance card transmission distance (control computer to display): Super 5 line 100m; multimode fiber Transmission time greater than 500 meters continuous working time: 48 hours uniformity: pixel light intensity, module brightness uniform switching power supply load: 5V/40A
Power protection: computer display mode with over temperature, over current and over voltage protection technology: 800×600, 1024×768
Image switching: VGA sync with frame relative humidity: ≤ 95%
7, control mode WINXP computer + control software hardware + playback software and hardware
8, protection technology moisture, corrosion, anti-static, at the same time with overcurrent, short circuit, overvoltage protection.
9, play content text files, WORD files, all picture files (BMP / JPG / GIF / PCX ...), all animation files all video files.
10. The modular structure design of the assembled structural unit, the screen adopts the module-display box-display combination assembly structure, and the assembly is convenient.
P6 specification display:
1, pixel indicators:
Pixel pitch: 6mm
Pixel composition: 1PR+1PG+1PB
Pixel point density: 27778 points / square meter
2, LED die: imported dilute, pure red, pure green, pure blue three primary color light-emitting diodes, the center point spacing is 6mm; display lighting tube brightness parameters:
The average brightness of the luminous tube is the best viewing angle. The central wavelength test condition is pure red? 250mcd 140/90o 620-625nm 25°C, 20mA
Pure green?? 460mcd 140/90o 520-525nm 25°C, 20mA
Pure blue?? 95mcd 140/90o 465-470nm 25°C, 20mA
3, the main technical indicators of the display body The entire display consists of the unit box, control circuit, switching power supply, steel frame structure, interior and exterior decoration.
Classification specifications and parameter requirements
1. Unit box physical point spacing: 6 mm
Lattice density: 27778 points / m2
Pixel composition: 1R1G1B
Drive mode: constant current drive single module resolution: 32 * 16 = 512 points box thickness: 100mm
Cabinet color: black or computer gray (optional)
2, the screen display screen full screen display area: 4.86 square meters best line of sight: 5M-50M
Best viewing angle: 120 degree working environment temperature: -25 °C - +55 °C
Working environment humidity: 25% - 95%
More than 5 frames around the entire screen
3, power supply working voltage: AC220V/220V or 380V ± 10%, 50Hz (three-phase five-wire system)
Maximum power consumption: about 1200W/m2
Average power consumption: about 550W/m2
Cabinet input voltage: 220±10%
4, control system operating system: WINDOWS98, WINDOWSNT WINDOWS2k WINDOWSXP
Control method: VGA synchronous graphics: DVI graphics
5, the main technical parameters brightness: 1600cd / m2 per square brightness above the gray level: 256 levels of gray per point base color.
Display color: 256*256*256, a total of 167,772 colors, mean time between failures: 10,000 hours of screen life: >100,000 hours (when the brightness is reduced by half)
Factory out of control rate: Zero image transmission speed: ≥160 frames/second Screen refresh rate: 300HZ (can be set according to computer refresh rate)
Brightness adjustment mode: software adjustment according to ambient brightness (0%-100% continuously adjustable)
Video input mode: configure multimedia video card, support various video, RF signal input control system: DVI graphics card + data acquisition card + data acceptance card transmission distance (control computer to display): Super 5 line 100m; multimode fiber Transmission time greater than 500 meters continuous working time: 48 hours uniformity: pixel light intensity, module brightness uniform switching power supply load: 5V/40A
Power protection: computer display mode with over temperature, over current and over voltage protection technology: 800×600, 1024×768
Image switching: VGA sync with frame relative humidity: ≤ 95%
7, control mode WINXP computer + control software hardware + playback software and hardware
8, protection technology moisture, corrosion, anti-static, at the same time with overcurrent, short circuit, overvoltage protection.
9, play content text files, WORD files, all picture files (BMP / JPG / GIF / PCX ...), all animation files all video files.
10. The modular structure design of the assembled structural unit, the screen adopts the module-display box-display combination assembly structure, and the assembly is convenient.
Third, the supplier's supplementary requirements
1. The bidder must have the ability to maintain and maintain the display screen immediately, and the screen is equipped with 2 unit modules.
2, two years free warranty, lifetime maintenance, on-site repair service within 24 hours.
The second package technical requirements:
Hefei Municipal People's Procuratorate weak electricity supplement list serial number product name model unit quantity basic parameters reference brand
1 Network management software custom set 2 See the attached list Shanghai Net Strong, ZTE, IBM
2 VGA splitter S-1004B station 32 4-port CREATOR, TAIDEN, AFINK
3 VGA switcher S-1225 station 8 4-port CREATOR, TAIDEN, AFINK
4 VGA extension cable custom meter 240 on-site custom connector (including connector) Jiangsu Tiancheng, Yangzhou Emperor Yi, red flag
5 keyboard and mouse extension cable custom meter 80 on-site custom connector (including connector) Jiangsu Tiancheng, Yangzhou Emperor, red flag
6 TV wall custom set 1 8 37′′ TV, 1 46′′ TV New Century, Xincheng, Leap
7 operating platform custom set 1 6 seats
8 Forwarding module CR-ZFQ only 2 Requires CREATOR, TAIDEN, AFINK with field devices
9 network control software custom set 1 need to be equipped with field equipment GA-SSJ, Tiandi Weiye, Shenzhen Wulingfeng
10 video splitter TC-224 station 1 point 2 GA-SSJ, Tiandi Weiye, Shenzhen Wulingfeng
11 Video Splitter TC-228 Table 3 One point 4 GA-SSJ, Tiandi Weiye, Shenzhen Wulingfeng
12 operating platform custom table 1 4 seats in the new century, Xincheng, leap
13 Switchboard 1 12 ports ZTE, Huawei, DLINK
14 power cord BV6 meter 300 Emerald, Copper Spring,
15 matrix keyboard TC8632-16II only 1 with field equipment GA-SSJ, Tiandi Weiye, Shenzhen Wulingfeng
17 camera D70 only 2 meets the highest inspection of the latest documents SONY, Nike, Samsung
18 Mixer MG16/4FX Table 1 GB30 Microphone Preamplifier and Precise Equalization Circuit True 7 Bus Structure Channel Direct Output, Convenient Intercom Call 100mm Trip Fader (Attenuator) Quadruple Set of +48V Fantasy The power switch selects 6 sets of AUX auxiliary outputs, among which 4 sets of AUX can select the pre-fader or post-fader 18dB/octave steep high-pass filter insertion point can be inserted in the total output or group output channel 12-segment LED level display PSU built-in power supply H-WIT, SONY, YAMAMA
19 KBG tube Φ20 m 40 domestic famous brand
20 plastic Ming box 86 only 30 deepen domestic famous brand
Overall requirements for network management:
It is convenient for the management personnel to operate at any position. The software should be in the B/S mode management mode. In order to adapt to large-scale network operation, the software can be deployed hierarchically and centrally. Suitable for multi-level management, such as provinces, cities and counties, software considers security, stability and smallness, portability requirements are written in JAVA. The back-end database supports various databases such as MySQL, SQL Server 2000 and Oracle. The software requirements are not single-point device management requirements, mainly application business, effective application of business service management methodology, better use of IT technology, improve IT management level, and achieve The business under IT support operates efficiently. There are cases in the Anhui Provincial Procuratorate System and have a unified interface with the political and legal network management.
The specific requirements for network equipment and service management systems are as follows:
Topology management:
1. Multiple topology management modes can be provided to suit different management requirements. ns-portal technology is used to display physical topology, network topology, schematic topology, service topology, and abbreviated topology. It is required that the device location can be placed arbitrarily on the B/S interface, and any schematic device that does not support the management protocol can be created.
2. In the physical topology, the device load indicates the current working condition by the color and icon, and the link traffic is updated in real time. The color is used to indicate the link traffic load update status, and the layered display is automatically expanded/retracted. Expand/retract the PC device. Supports direct discovery and automatic expansion of the device's downlink PC and all downlink PCs, and can be directly queried on the topology map.
3. The schematic topology requires that a very intuitive schematic structure diagram can be established according to the user's organizational structure, management structure, network structure and other different requirements.
4. Service topology, which can establish various service views according to the specific service of the user. The view includes a complete monitoring line for equipment, links, services, underlying data, people, etc.
5. Support bulletin board and information bar, support to display three dynamic topologies, support display of three TOPN lists, support bulletin board and information bar, support current abnormality in graph and list display, overall business health map, overall equipment Health status map, two displays in the overall link health map, support resource list function, but showing the health of 10 resources
6. Backplane management: The backplane of the real device is exactly the same as the physical backplane of the device. It supports the basic information about the downlink device of each port. It supports direct control of shutdown and startup, and supports alarm linkage to interrupt and open the port. Can be set freely
7. Downlink device and analysis: support direct view of the device information connected under the port, real-time analysis of the port, analysis of port connection rate and traffic information can be sorted and running state management:
1. Provide overall operation status, support the overall health degree chart of IT resources, and support the status of devices, services, links, applications, and services in status lights. Support current exception event query
2. The current operation list supports the operation of resources according to resource classification, geography, resource status, and resource criticality.
3. List of current indicators, support the current operation of resource indicators according to resource classification, region, resource name, resource IP address, resource status, and resource criticality.
4. The list of indicators for the day, support the day-to-day operation of resource indicators according to resource classification, region, resource name, resource IP address, resource status, and resource criticality.
Resource Management:
1. Resource list: The resource list shows all resources. Resources can be queried according to resource classification, geography, management status, and criticality. You can set the management status and criticality of resources and delete resources. Resource list can be exported to EXCEL
2. Resources can be added and synchronized. Routers, switches, Layer 3 switches, HUBs, PCs, servers, applications, services, links, resource sets, subnets, services, monitors, and single resources can be added. You can use SNMP, TELNET, or SSH to obtain device-related data. Support resource name customization
3. Device resource details: Support routers, switches, Layer 3 switches, HUBs, PCs, servers, and UPSs. Device details support device resource health and availability, CPU and memory utilization, device-related information modification (basic information, management information, device information) support monitoring indicators list, support related service lists, support subordinate resource lists, support interfaces Pick up the table and support the exception list
4. Application resource detailed information, support application resource health and availability, application related information modification (basic information, application information), support for monitoring indicators list, support related business lists, support subordinate resource lists, support exception lists, database management Such as sql2005, tomcat5, db2, apache and other application management such as: Tuxedo, jboss, boolean
5. Link resource detailed information, support link resource health and availability, link related information modification (basic information, management information), support for monitoring indicators list, support related service list, support subordinate resource list, support interface list , support exception list
6. Detailed information of service resources, support for service resource health and availability, modification of service related information (basic information, management information), support of monitoring indicators list, support of related service lists, support of subordinate resource lists, support of exception lists
7. Support resource set chart, modification of resource set related information (basic information, management information), support monitoring indicator list, support related business list, support subordinate resource list, support exception list
8. Support the health and availability of business resources, modify the basic information of the business, support the list of monitoring indicators, support related business lists, support subordinate resource lists, and support exception lists.
9. Support monitor resource health and availability, modify basic monitor information, support monitoring indicators list, support related service lists, support subordinate resource lists, support exception list performance and report analysis:
1, performance analysis chart, graphical display of performance indicators, at a glance to view the specified device or port system performance statistics indicators report chart
2. Device reports, device reports include: device, type, total bandwidth, input traffic, output traffic, bandwidth utilization, interrupt duration, interrupt time, connection rate, CPU load, memory utilization, number of failures, maximum CPU load, Maximum memory utilization
3, port report, port report includes: device, type, interface, bandwidth, input traffic, output traffic, bandwidth utilization, interrupt duration, connection rate, number of failures, maximum input traffic, maximum output traffic, maximum bandwidth utilization
4. Link report, link report includes: device, interface, traffic, bandwidth utilization, interrupt duration, and connection rate.
5. Ping report, ping report includes: Ping device name, Ping device IP address, Ping number, number of interruptions, average/maximum/minimum day delay (ms), packet loss rate
6. Service report, service report includes: device, service name, port, interrupt duration, interruption time, availability rate, number of failures
7. Real-time analysis of equipment and links, real-time monitoring of network operation, real-time data acquisition, analysis and visualization tools, arbitrarily set the time period of data acquisition, and provide graphical display effect.
Event and alarm management
1, the alarm method settings support mobile phone text message, E-mail, application trigger, voice, messenger message, list box, message box
2. When the port traffic exceeds the threshold, it supports automatic shutdown of the port for N seconds to realize traffic control.
3. Provide a work order linkage warning system with the operation and maintenance management system. Allow users to automate the process of processing hardware and software systems and application problems
4. IP-MAC binding. The network management system supports IP address, MAC address, and port (IP-MAC-Port) binding. It is true for network IP resource security management. When a device has a problem, it is convenient to find the device with problems. Accessing the switching device; discovering new, changed, mobile IP addresses, MAC addresses, and device port events in the network and generating alarms by acquiring device data in real time; supporting event shutdown port network management system server management module technical parameter server basic information management:
1, supported operating systems, support for the full range of Windows, IBM-AIX, HP-UX, FreeBSD, Solaris, Linux full range.
2, monitor the server installed procedures, at a glance the installed records and later add a reduction program will have a corresponding alarm
3, monitor the CPU usage, can be detailed to the monitoring process, monitor memory, monitor capacity and percentage, can be detailed to the monitoring process
4, monitor all and specify the use of individual processes, memory and CPU usage
5. Monitor the total space and usage space of the specified hard disk and the utilization rate, and identify the file system format.
6. Monitor multiple NICs on the server to support traffic and performance status, monitor traffic bandwidth and traffic size.
2. Application service management:
1. Monitor the operation of the WEB server (HTTP), FTP file server, DNS, and mail server (POP3/SMTP), set the verification method according to the service status, and generate an alarm notification administrator when the corresponding service result cannot be obtained.
2, support custom service port database management:
1, Oracle database and table space, monitoring database connection number and connection status, database cursor number, transaction number, database cache hit rate and database lock number, database session number and buffer pool hit rate, support Oracle 9i database and table space monitoring
2, SQLServer database, monitoring database performance indicators, total page number and free page count, cache click rate, data file size, transaction, login and logout number, user connection number, lock request number, lock memory number, total Memory usage, bulk requests, average lock wait time, lock waits, deadlocks, and connection status
3, Sybase, monitor Sybase, MySQL database active connections, deadlocks, lock waits, input / output packets, memory consumption, CPU usage and connection status, monitor the total number of database connections, receive byte rate, send bytes Rate, total seconds of continuous operation, and connection status, support for monitoring the management middleware of the latest MySQL 5.0 database:
1, Weblogic, support middleware monitoring items, monitoring for Weblogic parameters, including status, service connection pool, Weblogic Jms, ExecuteQueue, WebApp, Server
2, WebSphere, for the monitoring of various parameters of WebSphere, including WebSphere JVM, thread pool, connection pool, ServletSessions, Transaction, Bean, etc.
Environmental monitoring:
UPS status and system parameters support monitoring of UPS status and system parameters, including UPS status and R, S, and T inputs, output voltage, and output current. Company Name: Hefei Municipal Government Procurement Center Contact: Zhang Mingzhi Tel: 0551-2692066 E-mail: Fax: 0551-2692067 Postal Code: 230001 Address: 3rd Floor, Xingtai Building, 45 Jiu Shiqiao Street, Hefei (Changjiang Theater) opposite)
Title: LED display system and other weak electricity engineering supplementary equipment and network management software tender announcement Tender No.: Announcement date: March 7, 2009 deadline: March 13, 2009 Tendering agency: Anhui Dingxin Technology Engineering Co., Ltd. : Anhui Province - Hefei City Content: According to the "People's Republic of China Government Procurement Law", the Hefei Municipal Government Procurement Center was entrusted by Anhui Dingxin Technology Engineering Co., Ltd. to supplement equipment and network management for the weak building of the Hefei Municipal People's Procuratorate Complex. Software procurement projects conduct government procurement in a competitive manner.