No. Supplies Quantity unit of measurement 1 Polyethylene film bag 270×175 10000.0 One 4. Delivery date and location: June 30, 2018, Hubei Qianjiang Wangchang Salt Chemical Factory Contact: Zhang Jie Mobile: phone fax E-mail: In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee. Others Others ATKCONN ELECTRONICS CO., LTD , https://www.atkconn.com
3. Name and quantity of tender materials:
5. Bidder's basic qualification requirements:
5.1 Have the right to independently conclude the contract and the ability to perform the contract, obtain a business license in accordance with the law, business license is in its valid period, business license, tax registration certificate, organization code certificate is complete legal person or other organization with complete three certificates.
5.2. For VAT general taxpayers, there were no illegal records in other procurement activities attended in the past three years.
5.3 With the required material supply capacity and quality control measures, no significant quality problems have occurred during the use of the products provided in the past three years.
5.4 has a good business reputation, a sound financial accounting system, financial status and market behavior is good. It is not under the authority of the competent authority to revoke the business license, revoke the qualifications, suspend business for rectification, cancel the qualifications for the bid, and the property is taken over, frozen, or enter bankruptcy procedures.
5.5 There is no state in which Sinopec Corp. has been suspended from trading due to breach of contract or other reasons.
6. Other major qualification requirements:
6.1 The Bidder must independently own the production technology capabilities, plant, equipment and personnel, etc. The Bidder shall provide corresponding certification materials such as the equipment list.
7. Comply with other conditions stipulated by laws and regulations.
8. Detailed requirements are detailed in the bidding documents.
9. This tender accepts the application from the manufacturer (manufacturer), does not accept the agent's bid, and does not accept the distributor's bid.
10. The tender does not accept the consortium bid.
11. Evaluation method: The lowest tender price method that has been evaluated.
12. The cost of bidding documents: The bidding documents cost 1,000 yuan, which is purchased online and the tender documents are not refundable after sale.
13. Bidding Documents Sale Time: 11:00 November 15th, 2016 to 17:30pm, November 24th, 2016 (Beijing time, the same below).
14. Bidding Document Sales Method: The bidding documents are taken online and online. (.)
16. Deadline for submission of bids: 09:00 on 08 December 2016
17. Opening time: 08 December 2016 at 09:00
2. Project Content: In November 2016, Jianghan headquarters's consumption of salt-polyethylene thin-mold bag frame project profile: The project has passed approval and funds have been implemented.