No. project Work content 1 After the hardware construction of the primary frequency modulation large disturbance test platform for #6 and 7 units, the power plant site-side equipment was tested and jointly adjusted. Perform single-point test, database and logic modification on all signals; perform signal connection and testing on single-point signals; perform logic configuration on a frequency-modulated remote test system. 2 For unit #6 and unit 7 primary frequency modulation large disturbance test platform system and provincial adjustment joint debugging and dynamic debugging. Open-loop detection of a remote FM test signal. Check the unit's primary frequency modulation logic to confirm the setting of the FM deadband and frequency-load curve. Check that the frequency-relevant measured signal is correct and reliable. Perform a joint debugging and dynamic debugging of the FM remote test system and the provincial adjustment. Confirm that the above parameters are set correctly in the DCS history database. Record data, check and pass the test, and issue a test report of power grid approval and acceptance. Sixth, qualification requirements: Contact: Zhang Jie Mobile: phone fax E-mail: In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee. Si-Rubber Control Cable,Si-Rubber Insulation Control Cable,Si-Rubber Sheath Control Cable,Screen Si-Rubber Control Cable Baosheng Science&Technology Innovation Co.,Ltd , https://www.bscables.com
Category of Newsletter: Source of Domestic Tender Funding: Others 1. Tenderee: Huadian International Power Co., Ltd. Shiliquan Power Plant II. Bidding No.: ZB/GCJJ02-068-2016
Third, the contents of the tender: No. 6 No. 7 primary FM large disturbance test platform test four, the tender form:
This tender uses the post-qualification form to conduct qualification review on bidders. After the evaluation committee approves, the bid documents that do not meet the requirements for tender announcement qualification, performance, etc. will be rejected.
V. Project Overview:
1. The scale of the project is based on the requirements of the “Notice No. [2016] No. 249 for the Construction of a Frequency Modulation Remote Disturbance Test System for Generator Units of Shandong Power Grid†and “Technical Requirements for a Frequency Modulation Disturbance Test of the Thermal Power Unit of Shandong Power Gridâ€, and “Shandong Power Grid 2016 once The spirit of the meeting of FM management work conference, "power plant must build a FM remote test system." Combine the current FM frequency of #6 and 7 units in Shiliquan Power Plant, use the annual unit overhaul opportunity to implement the primary frequency modulation and large perturbation test platform construction, and install the same frequency modulation homologous device at the same time. Different frequency differences of the power grid adopt different action amplitudes, effective Ensure that the qualification rate of a frequency modulation operation and the primary frequency modulation large disturbance test of the power grid meet the grid assessment requirements. The project implementation items mainly include: 1) During the overhaul of the unit, the on-site equipment of the power plant after the construction of the primary frequency modulation large disturbance test platform for the #6 and 7 units is tested and jointly adjusted. 2) Logical configuration, system test, and dynamic test of primary frequency modulation large disturbance test platform for #6 and 7 units. The test results meet the relevant standards, specification requirements, and "Technical Specifications for Primary Frequency Modulation Disturbance Testing of Thermal Power Generation Units in Shandong Power Grid". Requirements, and issued a power grid recognized # 6 and 7 unit FM large disturbance test platform test, test report.
2. Equipment Overview The control system of the #6 unit of Shiliquan Power Plant is the OC6000E control system produced by GE Xinhua Control Engineering Co., Ltd., and the control system of the #7 unit is the XDPS400E control system produced by GE Xinhua Control Engineering Co., Ltd., and DEH is the Shanghai Xinhua Engineering Control Company. Produced DEH-V type system. The hardware of #6 and 7 unit primary FM large disturbance test platforms mainly includes UC660S remote-control FM RTU split-screen cabinet of Shandong Saibao Zhonghui Power Automation Co., Ltd. and NX-PFR primary frequency modulation intelligent control system of Shandong Naxin Power Technology Co., Ltd. .
3. Risk level three risk of the project: During the system commissioning and testing of the project, there is a logic configuration and debugging of the unit DCS system, such as commissioning and test operations.
4. Work scope (1) Testing and joint debugging of power plant site-end equipment after hardware construction of a frequency-modulated large disturbance test platform for #6 and 7 units, single-point testing of all signals, database and logic modification, and performing single-point signal Signal docking and testing; Logical configuration of a frequency-modulated remote test system.
(2) Perform dynamic tests on the entire FM remote test system. For the logic configuration, system test, and dynamic test of a large frequency disturbance test platform for #6 and 7 units, the test results meet the relevant standards, specification requirements, and “Technical Specifications for Primary Frequency Modulation Disturbance Testing of Thermal Power Generation Units in Shandong Power Grid†requirements in this specification. It also issued test reports and test reports for large-disturbance large-disturbance test platforms of #6 and 7 units approved by the grid.
5, the list of quantities
1) Enterprises incorporated in the People's Republic of China;
2) The bidder must have the construction qualification of Grade A and above in anti-corrosion and thermal insulation professional contracting;
3) The safety and integrity of the construction unit shall not be less than 80 points, and it shall not be a "blacklist" unit in the project security management platform issued by the branch company (contract);
4) Registered capital of 1 million and above;
5) The bidder shall have the qualification to produce a DCS control system or have a FM remote disturbance test performance;
6) The business license, qualification certificate and legal representative qualification certificate issued by the relevant administrative department have no safety construction accident certificate in the past 3 years;
7) The bidder has good bank credit and business reputation and is not being ordered to suspend business or bankruptcy, and the assets have not been reorganized, taken over and frozen. There have been no corruption issues such as bribery of bidders. The bidder has not breached the contract or been executed in any contract in the past 5 years, or any contract was cancelled due to the bidder's reasons;
8) Bidders have no bad records in China Huadian Corporation's system units. In the last five years, no accidents (including personal accidents) occurred in the equipment and subcontracted works for the power industry or other industries;
9) The bidder has no outstanding major lawsuits;
10) Two or more legal persons whose legal representative is the same person, and the parent company, wholly-owned subsidiary and its holding company may not bid at the same time in this project;
11) This project does not accept bids from the Consortium;
12) The bidder shall pay the bid security deposit according to the bidding documents;
13) Bidders who have bad performances will be disqualified. If false information is provided, once it is verified, its qualification for entry will be cancelled.
Seven announcements:
2. Time: November 11, 2016 - November 17, 2016
Tender code: CBL_20161113_1054483039